Specification Assistance

Define the right automation, integration and infrastructure requirements with practical technical guidance tailored to your project and specification.

Clear requirements

Describe how each area and connected building service is expected to operate.

share-nodes

Coordinated systems

Align automation requirements with lighting, HVAC, shading, access and energy specifications.

Suitable technology

Identify appropriate Loxone products and compatible third-party interfaces.

Defined responsibilities

Clarify the supply, installation, configuration and testing required from each contributor.

Better tender comparison

Give project teams a clearer basis for assessing quotations and proposed alternatives.

Specification Assistance

Depending on the project, it can include the system scope, room functions, equipment requirements, control interfaces, installation responsibilities, commissioning procedures and required documentation.

The specification should ideally develop alongside the architectural, electrical and mechanical designs. This allows automation requirements to be coordinated before products are ordered and construction begins.

Yes. DY-Techniek can review relevant documents to identify unclear requirements, missing interfaces, potential incompatibilities and areas requiring further coordination.

DY-Techniek can specify suitable Loxone components and define the required functionality or interfaces for compatible third-party equipment. Final compatibility depends on the selected products and the capabilities implemented by their manufacturers.

The service can include or contribute to relevant layouts, schematics, schedules and marked-up drawings where agreed. The exact deliverables depend on the project scope and design stage.

Yes. Clear automation requirements can give contractors and suppliers a more consistent basis for preparing proposals. Tender responses should still be reviewed to confirm inclusions, exclusions and technical compliance.

Each appointed designer, supplier and contractor remains responsible for the regulations, calculations, certifications and standards applicable to their work. DY-Techniek defines the requirements associated with the agreed Loxone automation scope and its interfaces.

Specify the experience, not only the equipment

A smart-building specification should explain more than which products need to be installed.

The project team must understand how rooms should respond, which systems must communicate and what users should be able to control. Without this functional information, equipment may be supplied without delivering the intended experience.

DY-Techniek helps translate the project brief into clear automation requirements that can guide design, procurement, installation and commissioning.

From project ambitions to defined requirements

Make intelligent-building objectives measurable.

Terms such as smart, automated and energy efficient can mean different things to different project participants.

A useful specification replaces broad ambitions with defined functions. It describes what information the system receives, how it should respond and which controls must remain available to occupants or building managers.

Explain how the completed building should behave.

Functional descriptions

Functional descriptions provide the connection between the client’s expectations and the technical design.

They can describe how lighting responds to occupancy, how climate settings change between operating modes or how an authorised arrival affects access and selected building functions.

These descriptions provide a shared reference for consultants, installers and commissioning teams.

Inputs

Identify the sensors, schedules, controls and system information used to make decisions.

Automated responses

Describe the actions expected when defined conditions occur.

Manual controls

Clarify which functions occupants and authorised users can adjust.

Operating modes

Define appropriate occupied, unoccupied, daytime, night-time or special-use behaviour.

Exceptions and overrides

Explain how the system should respond when normal routines need to change.

Define the right functions in the right places.

Room and area requirements

Different areas rarely require identical automation.

An office, apartment, plant room and communal entrance each serves a different purpose. The specification should reflect those differences while maintaining consistent control principles across the project.

Room-based requirements also help connect the functional design with equipment schedules and drawings.

Room functions

Describe the lighting, climate, shading and other controls required in each area.

Sensor requirements

Identify appropriate presence, temperature, brightness or environmental measurements.

User interaction

Define the wall controls, scenes and authorised app functions available.

Area relationships

Clarify how individual spaces interact with shared systems and building-wide modes.

Equipment selection

Match products to the required outcome.

Products should be selected because they support the intended function, not simply because they can be connected.

DY-Techniek assesses the automation requirements and identifies appropriate Loxone components. Relevant third-party equipment can be reviewed to confirm its control method, available feedback and interface requirements.

Final selections should also consider the architectural design, environmental conditions and responsibilities of the relevant specialist consultants.

Controllers

Select suitable local intelligence and expansion capacity for the project.

Sensors and controls

Match device capabilities with the required measurements and interactions.

Actuation equipment

Define appropriate outputs for connected lighting, shading, valves and other supported functions.

Communication interfaces

Identify the technologies required to exchange information with compatible equipment.

Supporting infrastructure

Consider power supplies, enclosures, networks, protection and necessary panel capacity.

Specify more than switching and dimming.

Lighting-control requirements

An effective lighting-control specification considers how illumination supports the activities and character of each space.

It should define appropriate groups, scenes, dimming behaviour, occupancy response and available daylight control. The selected luminaires and drivers must then provide the capabilities required by that strategy.

Lighting groups

Organise fittings around room use, architecture and required control.

Scenes

Define useful lighting combinations for recurring activities.

Dimming

Establish where adjustable light levels are required.

Occupancy response

Describe how lighting should behave when people enter or leave selected spaces.

Lighting interfaces

Confirm how compatible drivers and control equipment communicate with Loxone.

Coordinate controls with the mechanical design.

Climate-control requirements

Automation cannot compensate for unsuitable or incorrectly sized climate equipment.

The mechanical design must establish how heating, cooling and ventilation will meet the building’s requirements. The automation specification then defines how compatible equipment should be monitored and controlled.

This may include zoning, temperature measurement, schedules, occupancy modes and ventilation response.

Zone structure

Align control zones with room layouts and mechanical equipment.

Temperature targets

Define how appropriate settings can change around occupancy and schedules.

Air-quality response

Describe how compatible ventilation should use available CO₂ or humidity information.

Open-window behaviour

Establish the response where suitable contacts and controllable equipment are installed.

Mechanical interface

Confirm the information and commands available through the proposed equipment.

Close the gaps between contractors.

Building automation often sits between several trade packages.

Without clear boundaries, essential equipment or services can be omitted because each party assumes someone else is responsible. A coordinated specification should identify what is included in the automation package and what must be provided elsewhere.

Equipment supply

Define who supplies each controller, interface, sensor and supporting component.

Cabling

Assign responsibility for containment, cable installation, termination and testing.

Mounting and connection

Clarify who installs field devices and completes electrical connections.

Programming

Identify responsibility for Loxone configuration and third-party control settings.

Handover

Define the documentation, training and system access required at completion.

Define how successful delivery will be demonstrated.

Commissioning requirements

Commissioning should be planned before installation reaches completion.

The specification can establish which devices, interfaces and coordinated functions need to be tested. It can also define the documentation and participation required from relevant contractors.

This provides a clearer route from installation to an operational building.

Device testing

Confirm the correct operation of connected sensors, controls and outputs.

Interface testing

Verify supported communication with compatible third-party systems.

Functional testing

Demonstrate complete automated routines against the agreed descriptions.

Defect resolution

Record incomplete or incorrect functions requiring further work.

Handover records

Provide appropriate configuration, testing and operating information.

Compatibility

Specifications built around real interfaces.

A development may combine products from multiple manufacturers.

Loxone can communicate with compatible systems through supported technologies such as BACnet, Modbus, DALI, EEBUS and appropriate digital, analogue or network connections.

The available information and control depend on the selected product and its implemented interface. DY-Techniek reviews technical documentation and coordinates with relevant suppliers to define realistic integration requirements.

Architects & Planners

Project Collaboration

Technical Planning

Smart Building Design Support

Give every smart-building requirement a clear direction.

Automation specifications that support confident delivery.

Translate your project’s intelligent-building ambitions into defined functions, suitable equipment and coordinated responsibilities. Give consultants, suppliers and contractors a shared reference from design and tendering through commissioning and handover.